RB iconIP iconMPE iconRBAS iconRouse icon

PERFORATOR RBZ 60 Rohrberst- und Zuganlage

税別価格

Favoriteお気に入り
shareシェア
Save search検索結果を保存
印刷

情報

機械カテゴリー
水平掘削リグ
メーカー/型式
PERFORATOR RBZ 60 Rohrberst- und Zuganlage
製造年
2023
コンディション
未使用
機械の所在地
Walkenried, Niedersachsen
ドイツ
一般グレード
1
2
3
4
5
マスカス ID
2D642D8F

価格

通貨を選択

詳細

コンディション情報/保証
Neuzustand, Gewährleistung 12 Monate
運搬時重量
500 kg
運搬時寸法(全長X全幅X全高)
700 x 600 x 300 mm
納期
FCA, CPT
その他情報
pulling unit - 4 hydraulic cylinders - stroke 210 mm - tractive force 600 kN - operating pressure max. 300 bar clamping unit ø60 mm - hydraulic cylinder - stroke 15 mm - operating pressure 310 bar - maximum pressing force 1,260 kN - operating pressure max. 300 bar - holding jaws ø60 mm holding unit ø60 mm - hydraulic cylinder - stroke 25 mm - max. clamping force 128 kN With the PERFORATOR RBZ-series bursting systems, pipes can be renewed and renovated in an environmentally friendly manner and without trenching in old routes. Depending on the requirements and the damage to the old pipeline, various methods can be used. The static pipe bursting method is used for the renewal of pipelines in old routes. Regardless of whether it is a gravity or pressure pipeline, the old pipeline is cut into segments by breaking or cutting, and displaced radially into the surrounding soil. At the same time, a new pipe of the same or larger dimension is pulled in. The bursting method is suitable for almost all old and new pipe materials. The pressing/drawing process involves the complete replacement of existing pipelines in a single operation. The old pipe is completely removed from the ground. The new pipe can be drawn in with the same or larger dimensions. The auxiliary pipe method is also a route-equivalent, complete replacement of existing pipelines in two work steps. It is particularly suitable for old pipes made of cast iron, ductile cast iron, steel and fibre cement. In the relining process with annular gap, pipe strings or individual pipes are inserted into the existing pipelines. The pipe dimension is reduced and the annular gap is filled depending on the process variant. In relining processes without an annular gap, a PE pipe string with a reduced cross-section is inserted into the old pipeline. In the reduction process, the new pipe later lies close to the old pipe wall (close-fit). Both process variants are suitable for both gravity and pressure pipes. The RBZ series comprises two machine sizes. This means that pipelines up to a pipe diameter of 1.000 mm can be laid trenchlessly.もっと表示する

PERFORATOR GmbH

Bei dem Gerichte 37445 Walkenried Niedersachsen ドイツ
メール通知を受け取る
report ad不審な掲載機械を報告