RB iconIP iconMPE iconRBAS iconRouse icon

Metalika C-1200 Concrete pipe making machine

税別価格

金額応相談

Favoriteお気に入り
shareシェア
Save search検索結果を保存
印刷

情報

機械カテゴリー
コンクリート・ストーンマシン
メーカー/型式
Metalika C-1200 Concrete pipe making machine
製造年
2020
コンディション
未使用
機械の所在地
Sopot (Srbija)
セルビア
一般グレード
1
2
3
4
5
マスカス ID
778AEBF6

詳細

エンジン
Elektro
コンディション情報/保証
12 meseci
製造国
セルビア
納期
FCA, CPT, CIP, DAT, DAP, DDP, FAS, FOB, CFR, CIF, EXW
証明書
EPA, CE, ANSI, AS, CSA, EAC GOST, TRUA, JIS
アクセサリー・アタッチメント
制御システム
制御室
コンクリート貯蔵
その他情報
Concrete Pipe Machine C-1200 (Machine for producing concrete pipes). Machine for producing concrete pipes C-1200 produces concrete pipes diameter from 300-1200mm by vibrating of core. Machine is placed in concrete base built according to manufacturer’s layout. Forming head, electric and hydraulic controls are placed above surface. Main parts of C-1200: - Main hydraulic cylinder stand - Hydraulic cylinder with core bearer - Core with vibrators Bfkxkxxqdc - Chassis with steel plate Technical data of Concrete Pipe making machine C-1200: - Pipe diameter: fi200 - fi1200 - Pipe height max: 1m - Installed power: 18 kW / 380 V - Simultaneously max: 11 KW Capacity for producing concrete pipes height 1m: 1. 150 pipes - fi300 per 8h 2. 150 pipes - fi400 per 8h 3. 120 pipes - fi500 per 8h 4. 90 pipes - fi600 per 8h 5. 50 pipes - fi1000 per 8h 6. 40 pipes - fi1200 per 8h - Concrete base dimensions: 4100x3470x2150 - Forming head height 1500 mm. - Total weight without ring pads: 6135 kg (with outside moulds and core fi300/400/600) Number of workers needed: •Concrete transport from concrete plant to machine C-1200: 1 •Operator C-1200 : 1 •Fresh pipes transport from machine to curing place with accu cart: 1 or •Fresh pipes transport from machine to curing place with standard cart for fi300-fi 700mm: 1 or •Fresh pipes transport from machine to curing place with standard cart for fi800-fi 1200mm: 3 •Worker for placing ring pad in machine: 1 Space required for machine C-1200……………………… 70m2 Storage place for ring pads and moulds......………………..10m2 Space required for daily production of pipe fi 1000mm: •45 pipes fi 1000: 60m2 •Pipes need to cure 48h before removing ring pad: 120m2 •Pipes need to cure for 10 days before transport (storage of products): 400m2 Total space required for production of pipes: 660m2 + 100m2 for transport paths = 760m2 *It is good to have all this space indoor, but necessary indoor space is only for machine (70m2), rest can be done on the outdoor. Mechanisation: Forklift 5t, with silo, for concrete transport (from concrete plant to machine C-1200) For more extra optional equipment and detail offer, send inquiry or call me on my mobile number.もっと表示する

METALIKA SMTR

Milosava Vlajića 116e 11450 Sopot Beograd, Srbija セルビア
メール通知を受け取る
report ad不審な掲載機械を報告