Production Cycles
25.57 Average haul road speeds (KPH)
90 Loading and unloading times in seconds (Average)
1000 Total distance of travel in metres (Round trip)
90% Load factor efficiency
90% Availability Factor
Operating Results
19.27 Cubic metres per cycle
3.85 Cycle time in minutes
15.60 Cycles per hour
300.6 Cubic metres per tach hour
541,084 Cubic metres per year
Production - times can vary based on the materials and conditions
The production cycles were recorded in Iport, Doncaster by Williams Plant Hireもっと表示する