RB iconIP iconMPE iconRBAS iconRouse icon
Favoriteお気に入り
shareシェア
Save search検索結果を保存
印刷

情報

機械カテゴリー
タワークレーン
メーカー/型式
V-Tech VERLIFT
製造年
2009
使用時間数
8663 時間
機械の所在地
Bassum, Vokietija, Vilniaus apskritis
リトアニア
マスカス ID
6C1F24ED

価格

通貨を選択

詳細

総重量
6134 kg
最大リフト容量
32000 kg
ブーム幅
1180 cm
最大リフト高度
7700 cm
カウンターウエイト
Concrete block
オリジナルカラー
Yellow
キャリアタイプ
ホイル式
アタッチメント
With the VERLIFT crane it is possible to build up in very extreme conditions (wind and temperature) safely element by element. During the design time minimisation has also been taken into account for the positioning to object. All parts of the VERLIFT can be transported in a 20’ or 40’ container, which makes the freight forwarding to hard reachable destinations easier. The Crane is also equipped with an optional self-drive-mechanism, in order to be able to move itself. As soon as the object is assembled completely, the VERLIFT is able to lower itself through the windmill. The VERLIFT is designed in a way that the transportation is possible within three (3) 40’ containers (of which one is a 1 flat rack) and the weights and dimensions of it are as follows (last photo). Counterweight: in concrete block in the ground. Calculation standard All calculations were made according to Eurocode.
その他情報
With the VERLIFT crane it is possible to build up in very extreme conditions (wind and temperature) safely element by element. During the design time minimisation has also been taken into account for the positioning to object. All parts of the VERLIFT can be transported in a 20’ or 40’ container, which makes the freight forwarding to hard reachable destinations easier. The Crane is also equipped with an optional self-drive-mechanism, in order to be able to move itself. As soon as the object is assembled completely, the VERLIFT is able to lower itself through the windmill. The VERLIFT is designed in a way that the transportation is possible within three (3) 40’ containers (of which one is a 1 flat rack) and the weights and dimensions of it are as follows (last photo). Counterweight: in concrete block in the ground. Calculation standard All calculations were made according to Eurocode. The following load factors were considered: static: factor 1,4 dynamic: factor 1,2 Wind speed limit For the maximum admissible wind speed, following values must be respected: Lifting operations: 12 m/s Telescopic manipulation of the tower: 20 m/s Stand-still, boom as high as possible (± 12 m tower free): 60 m/s Stand-still, boom just above the windmill: 114 m/s Temperature limit The temperature during which can be worked must be restricted between -40°C to +60°C, due to the limitations of the cable sheaves.もっと表示する

UAB WIND TURBINE

Vėtrungių gatvė 87-56 LT-06331 Vilnius, Vilniaus Apskritis リトアニア
メール通知を受け取る
report ad不審な掲載機械を報告